Updated Articles

  1. SB-47 Piper J-2/J-3 Preparation for Winter Operation

    Piper  Service Bulletin No. 47 Applicability: Piper E-2, J-2, and J-3 System: Operations Issue Date: February 19, 1946 Subject : Preparation for Winter Operation Summary: There are several items of equipment in the en...
  2. SB-18 Piper J-2/J-3 Replacement of Tailbrace Wire Nipples

    Piper  Service Bulletin No. 18 Applicability:   J-2 Cub serial numbers 1500 to 1999 J-3 Cub serial numbers 2000 to 2609 System: Control Issue Date: February 18, 1946 Subject : Replacement of Tailbrace Wire Nipple...
  3. SB-01 Piper J-2/J-3 Rigging Procedure

    Piper Service Bulletin No. 1 Applicability: Piper E-2, J-2, J-3 System: Rigging Issue Date: February 15, 1946 Subject : How to Rig Cub E-2, J-2, J-3 Airplanes Summary: Instructions for rigging Piper Cub E-2, J-2, and J-3 airplane...
  4. SB-01 Piper J-2/J-3 Rigging Procedure

    Instructions for rigging Piper Cub E-2, J-2, and J-3 airplanes
  5. LPC-1 Amendment A Mandatory Landing Gear Product Improvement

    To preclude the possibility of failure at the upper shock strut-drag tube area of the LPC 1012 series landing gear vees used in the STC-SA45RM taildragger modification, a second gusset has been added to the upper end of the streamline brace tube.
  6. SA 18-2A Piper PA-18 Aileron and Flap Hinge Bracket Attaching Hardware

    Correcting a condition that could cause loss of security of one or more screws which attach the aileron and flap hinge brackets.
  7. Piper PA-16 Paint Scheme

    Downloadable paint scheme sheet for Piper PA-16.
  8. Piper J-3 Paint Scheme

    Downloadable paint scheme sheet for Piper J-3.
  9. Piper PA-11 Paint Scheme

    Downloadable paint scheme sheet for Piper PA-11.
  10. Piper PA-12 Paint Scheme

    Downloadable paint scheme sheet for Piper PA-12.