-
Failure of the fuel shut-off control attachment at the swivel fitting.
-
Inspecting tail brace rod clevises attached to the fin for cracks and replacing wherever necessary.
-
Failure of strainer/carburetor attaching fittings which may be attributed metal fatigue.
-
Reports of binding in the stabilizer rear support bearing and, as the link tube at the adjustment yoke is of similar construction, there is a possibility that the same difficulty may occur there.
-
Immediate changes necessary in the bungee installation.
-
Rib repair diagram for Piper J-3, J-4, and J-5 aircraft.
-
Reported failures of the ribstitching both in the wing and control surface covering which may result in the fabric being torn from the structure while in flight.
-
Rib repair diagram for Piper J-3, J-4, and J-5 aircraft.
-
Piper Service Bulletin No. 77 Applicability: Piper E-2, F-2, J-2 and J-3 Cubs System: Cabin, Control Issue Date: February 18, 1946 Subject : Seats, Safety Belts and Control Cables Summary: Inspecting the condition of...
-
Piper Service Bulletin No. 50 Applicability: Piper E-2, J-2, J-3, J-4 and J-5 System: Finishing Issue Date: February 19, 1946 Subject : Ribstitching Summary: Reported failures of the ribstitching both in the wing and...