SB-47 Piper J-2/J-3 Preparation for Winter Operation

Piper Service Bulletin No. 47

Applicability: Piper E-2, J-2, and J-3

System: Operations

Issue Date: February 19, 1946

Subject: Preparation for Winter Operation

Summary: There are several items of equipment in the engine installation which should be carefully inspected to insure satisfactory winter operation.

Open PDF: PIP_SB47.pdf