Popular Articles

  1. EB-12 Luscombe Fuel Injector Vent

    Modifications to the fuel injector vent.
  2. SB-47 Piper J-2/J-3 Preparation for Winter Operation

    There are several items of equipment in the engine installation which should be carefully inspected to insure satisfactory winter operation.
  3. SB-31 Piper J-5 Fuel Tank Strainers

    Instructions for equipping the fuel tank outlets with finger strainers.
  4. SB-163A Piper PA-20/PA-22 Fusing of Cigar Lighter Circuit

    Installing an additional standard fuse (15A Bussman #AGC-15) in the wire between the cigar lighter and the ammeter at the next 100 hour inspection to protect against a short circuit condition.
  5. SM-73 Piper PA-22 Nose Wheel Oleo Boot Assembly

    Installation of this boot will reduce the possibility of moisture accumulating between the oleo assembly and the oleo housing.
  6. SB-20 Alon/Forney/Mooney Cylinder Head Temperature Indicator

    Reports have been received indicating overheating of cylinder heads. To provide continuous indication of engine operating temperatures accomplish the following.
  7. SM-50 Ercoupe Installation of Replacement Aluminum Wing Tanks

    Information and installation instructions for replacing a ternplate fuel tank with an aluminum fuel tank.
  8. SB-26 Ercoupe Control Column Inspection

    Procedure for dye penetrant inspection of control column tee for evidence of cracks.
  9. SL-02 Luscombe Fairleads

    Instructions for installing Micarta fairleads on the fifth and eighth nose ribs to prevent slack aileron cables from rubbing on the metal edge.
  10. SB-66 Piper Flexible Hose End Fittings (3/8" Synthetic)

    Testing for secure attachment of flexible hose end fittings.