-
Modifications to the fuel injector vent.
-
There are several items of equipment in the engine installation which should be carefully inspected to insure satisfactory winter operation.
-
Instructions for equipping the fuel tank outlets with finger strainers.
-
Installing an additional standard fuse (15A Bussman #AGC-15) in the wire between the cigar lighter and the ammeter at the next 100 hour inspection to protect against a short circuit condition.
-
Installation of this boot will reduce the possibility of moisture accumulating between the oleo assembly and the oleo housing.
-
Reports have been received indicating overheating of cylinder heads. To provide continuous indication of engine operating temperatures accomplish the following.
-
Information and installation instructions for replacing a ternplate fuel tank with an aluminum fuel tank.
-
Procedure for dye penetrant inspection of control column tee for evidence of cracks.
-
Instructions for installing Micarta fairleads on the fifth and eighth nose ribs to prevent slack aileron cables from rubbing on the metal edge.
-
Testing for secure attachment of flexible hose end fittings.