Piper Service Bulletin No. 47
Applicability: Piper E-2, J-2, and J-3
System: Operations
Issue Date: February 19, 1946
Subject: Preparation for Winter Operation
Summary: There are several items of equipment in the engine installation which should be carefully inspected to insure satisfactory winter operation.
Open PDF: PIP_SB47.pdf