Updated Articles

  1. SB 2-47 Luscombe Prop Spinner Installation

    Installation of improved propeller spinner attachment.
  2. SB 3-48 Luscombe Rework of Rear Spar Hinge Bracket

    Prevention of cracks developing in the side flanges of the stabilizer attaching bracket.
  3. SB 3-47 Luscombe Fin and Rear Spar Fitting Inspection

    Inspection for evidence of cracks and rework instructions of the vertical stabilizer attachment fitting.
  4. EB-18 Luscombe Rudder Cable Pulleys

    Recommended repair and alteration for fraying rudder cables.
  5. EB-16 Luscombe Upper Fin Spar Cracks

    Recommended repair for cracks in rear fin spar at upper hinge bracket.
  6. SL-02 Luscombe Fairleads

    Instructions for installing Micarta fairleads on the fifth and eighth nose ribs to prevent slack aileron cables from rubbing on the metal edge.
  7. SB 2-46 Luscombe Gear Rework to Eliminate Toe In

    Rework instructions for alignment of landing gear wheels.
  8. EB-19 Luscombe Cracks in Aileron Hinge Bracket

    Inspection and recommended repair to aileron hinge bracket.
  9. EB-11 Luscombe Cold Weather Operation

    Correcting low oil temperature in the engine during cold weather operation.
  10. EB-14 Luscombe Fuel Line Change

    Modifications to prevent fuel line failures aft of the firewall.