Updated Articles

  1. SB 5-46 Luscombe Battery Cable Clip

    Installation of battery cable clip to preclude possible short circuiting of the battery cable.
  2. SB Luscombe Rudder Horn Inspection

    Inspection of 18432 rudder horn for excessive wear and elongation of eyebolt attachment holes.
  3. SB 2-47 Luscombe Prop Spinner Installation

    Installation of improved propeller spinner attachment.
  4. SB 3-48 Luscombe Rework of Rear Spar Hinge Bracket

    Prevention of cracks developing in the side flanges of the stabilizer attaching bracket.
  5. SB 3-47 Luscombe Fin and Rear Spar Fitting Inspection

    Inspection for evidence of cracks and rework instructions of the vertical stabilizer attachment fitting.
  6. EB-18 Luscombe Rudder Cable Pulleys

    Recommended repair and alteration for fraying rudder cables.
  7. EB-16 Luscombe Upper Fin Spar Cracks

    Recommended repair for cracks in rear fin spar at upper hinge bracket.
  8. SL-02 Luscombe Fairleads

    Instructions for installing Micarta fairleads on the fifth and eighth nose ribs to prevent slack aileron cables from rubbing on the metal edge.
  9. SB 2-46 Luscombe Gear Rework to Eliminate Toe In

    Rework instructions for alignment of landing gear wheels.
  10. EB-19 Luscombe Cracks in Aileron Hinge Bracket

    Inspection and recommended repair to aileron hinge bracket.