-
Steps to detect permanent deformation and/or cracks in the lower frame side tubes on the adjustable front seat.
-
Method of effecting engine change for increased horsepower.
-
The compliance time for inspection of lift strut assemblies is changed from every 5 years to every 12 months.
-
Steps to prevent the possible loss of elevator trim control.
-
Approval of McCauley 1A90CF and 1B90CM Propellers on the 415-E & G per TC A-787 Rev. 33.
-
Downloadable paint scheme sheet for Piper J-3.
-
Model PA-22 rigging procedure (supplement to PA-20 Rigging Procedure).
-
Genealogy of Aeronca, Champion, and Bellanca 7 Series Models.
-
Article titled "J-3 Aileron Cable Pulley Installation" by Joel Gehring from Cub Clues #139 March/April 2007.
-
General specifications and performance data for the Piper Vagabond PA-15 and the Piper Vagabond Trainer PA-17.