Popular Articles

  1. SB Luscombe Engine Change to More Horsepower

    Method of effecting engine change for increased horsepower.
  2. Piper J-3 Gross Weight Increase Parts 1 thru 4

    "Identifying a Cub's Gross Weight" by Joel Gehring excerpted from Cub Clues #135 July/August 2006.
  3. SB-910A Piper PA-18/PA-19 Wing Lift Strut Assembly Inspection Interval

    The compliance time for inspection of lift strut assemblies is changed from every 5 years to every 12 months.
  4. AD 82-07-02 Engine Crankcase Breather

    Steps to prevent the possible loss of elevator trim control.
  5. McCauley Propeller Approval for Ercoupe 1A90CF/1B90CM

    Approval of McCauley 1A90CF and 1B90CM Propellers on the 415-E & G per TC A-787 Rev. 33.
  6. SM-21 Piper Rigging Procedure Supplement to PA-20 for PA-22

    Model PA-22 rigging procedure (supplement to PA-20 Rigging Procedure).
  7. AD 2002-26-02 Wing Center Section

    Inspecting the wing center section for evidence of corrosion through the installation of inspection openings and use use of a specified scope and light source.
  8. AD 79-08-03 Electrical System Failure

    How to prevent an inflight electrical system failure, smoke in the cockpit, and/or fire in the wire bundle behind the instrument panel.
  9. Aeronca Genealogy

    Genealogy of Aeronca, Champion, and Bellanca 7 Series Models.
  10. Piper J-3 Paint Scheme

    Downloadable paint scheme sheet for Piper J-3.