Popular Articles

  1. SM-21 Piper Rigging Procedure Supplement to PA-20 for PA-22

    Model PA-22 rigging procedure (supplement to PA-20 Rigging Procedure).
  2. SM-59 Ercoupe Assembly and Installation of Rudder Pedals

    In keeping with the many requests we have had for rudder pedal installations in the Ercoupe, we are now adding SK-21 Rudder Pedal Kit to our long list of optional equipment and accessories.
  3. Evolution of Scott Tailwheels

    Information on the evolution of the various Scott tailwheel models.
  4. SM-41 Ercoupe Rebuilding of Nose Landing Gear Assembly

    Information and instructions for maintaining and rebuilding the Ercoupe nose landing gear assembly.
  5. AD 74-17-04 Fabric Reinforcement

    How to prevent sudden failure of the fabric at the top of the windshield where the fabric attaches to the channel.
  6. Piper Tail Brace Wire Adjustment

    Determining the maximum and minimum lengths the tail brace wire should protrude through brass nipple U41051-000.
  7. AD 96-24-17 R1 Wing Inspection Holes

    Installing new inspection holes, modifying the wing tip fairings, and inspecting the wing spars for intergranular corrosion.
  8. Piper J-3 Paint Scheme

    Downloadable paint scheme sheet for Piper J-3.
  9. AD 2003-21-01 Outer Wing Panels

    Requires installing inspection openings in the outer wing panels, inspecting the wing outer panel structural components for corrosion, and repairing any corroded component.
  10. AD 90-15-15 R1 Front Spar Strut Fittings

    Directions to prevent failure of the upper wing front spar strut fittings, P/N 2-1976, that could result in an in-flight separation of the wing.