Popular Articles

  1. SB P-2 Univair Inspection of Landing Gear Hydrasorb Shock Struts

    Procedure for examining both left and right Univair hydrasorb (U486-604-1) for any possible cracks or irregularities.
  2. AD 74-23-04 Rib Flanges

    Steps to detect evidence of fatigue cracks and/or distortion of rib flanges, and required repairs if damage is found.
  3. AD 67-24-02 Engine Fuel Starvation

    To forestall the possibility of engine fuel starvation during takeoff operations, install a placard on the right fuel quantity gauge.
  4. EB-11 Luscombe Cold Weather Operation

    Correcting low oil temperature in the engine during cold weather operation.
  5. SB-45 Piper J-3 Control System Interference

    Interference of the torque tube with the front seat canvas and of the elevator bellcrank with the rear seat canvas.
  6. SB-868 Piper Forward Fuel Header Tank Installation

    Installing an improved forward fuel header tank with thicker walls and welded seals, which provides greater resistance to impact rupture in the event of an accident.
  7. Piper J-5 Paint Schemes

    Downloadable paint scheme sheets for Piper J-5. Available for 1940 and 1941 models.
  8. AD 62-24-03 Cabin Heat System

    Failures of the exhaust stacks have occurred in the area of the cabin heat muffs, causing hazardous carbon monoxide contamination of the cabin when cabin heat is used.
  9. SB-28 Rev A Ercoupe Fuel Gauge Cork and Tank Slosh Inspection

    Procedure for visual inspection of coating on fuel gauge cork floats and inner fuel tanks for deterioration.
  10. SB-305 Piper Inspection of Carburetor Drain Plugs

    Instructions for compliance with Marvel-Schebler Division Bulletin No. A1-69.